| Tickets | Newsletter | Shop | Press | Contact | Imprint | Sitemap     || Deutsch
| Home | Berliner Festspiele | Renovating the Stage Machinery | The Building Site
| Renovating the Stage Machinery
| The Building Site
Opens a print version in a new window
Page      1 | 2 | 3 | 4 | 5    

The Building Site at the Haus der Berliner Festspiele


1st construction phase
(28-12-2009 to 16-04-2010)


The Stage

Renovating the floor on the main stage
under stage machinery with revolve
steel structure of revolve
steel structuer of revolve from below
Cross joints on the revolve
the old stage floor
the old stage floor
Renovating the floor on the main stage
Renovating the floor on the main stage
the stage
the stage
the stage
the stage
the stage
the stage
the stage
the stage
the stage
the stage
the stage
the stage
the stage
the stage
the stage
the stage
in the basement
the stage
the stage
the stage
the stage
in the basement
in the basement
the stage
the stage
the stage
the stage
the stage
the stage
the stage
the stage
the stage
the stage
the stage


Page      1 | 2 | 3 | 4 | 5    

| back